Ronan X90 Series Manuel d'utilisateur Page 14

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 13
12.0 LEAK TEST PROCEDURES FOR
SEALED SOURCES
12.1 Ronan Leak Testing Service
The NRC requires that all sealed sources be tested
for leakage at specified intervals. Only Kr-85,
tritium and certain sources of very small activity (10
CFR 30.18a) are exempted from leak testing.
Ronan Engineering provides for users’ convenience
and safety the “Leak Testing Service.” The leak
testing procedure detailed in these instructions
applies only to the Ronan Model WK Leak Testing
Kit supplied with the Ronan Leak Testing Service.
The Ronan Model WK Leak Testing Kit is intended
for use on all sealed sources that are not exempt
from testing.
This service may be purchased from Ronan on a
contract basis for five years when wipe testing at
six-month intervals is required or on a one-time
basis in the case of three-year wipe test intervals.
The service must be purchased for each individual
source. If the service is retained, Ronan will send
the required number of leak test kits, consisting of:
a) A cotton swab (“Q-tip”) saturated in radiac
wash, contained in a small plastic tube.
b) Special instructions on its use.
c) Leak test forms.
After the sealed sources have been wiped by the
materials, issue a report based on the results and
forward a copy of the results to the customer
immediately.
12.2 Using the Leak Test Kit:
For instructions on using the Leak Test Kit see
section 11.8.4 for well sources or section 11.9.2 for
standard sources.
Return the shipping tube, prepaid, via United
Parcel Services (UPS). Do not send the shipping
tube via conventional mail, as postal regulations
prohibit mailing of radioactive material in this form.
Upon receipt of the wipe, Ronan will perform a
sensitive analysis to determine the presence of
radioactive material. If the wipe is contamination-
free, a notice will be sent via mail that the source is
leak-free. If radioactive material exceeding .005
microcuries is detected on the wipe, an emergency
notification will be sent via telegram or telephone,
advising that the source holder must be taken out
of service and sent back for repair. The emergency
notification will contain detailed instructions for
removal and shipment of source holder.
Ronan will maintain records of each leak test
analysis performed. The records will include the
name and address of the customer; the date the
sample was collected; the individual collecting the
sample; the person performing the analysis; the
date the analysis was performed; the unique
identification of the source being tested; the
radioactive material and mass number contained in
the source; and the results of the test expressed in
PARTS LIST—SERIES X90 POINT LEVEL MONITOR
Item
Qty.
ID
Part No.
Description
Vendor
1 1 R1 RC20GF105J Resistor, Carbon, ½ W, 5%, 1.0 Meg Allen-Bradley
2
1
R2
RC20GF335J
Resistor, Carbon, ½ W, 5%, 3.3 Meg
Allen-Bradley
3
1
R3
RC20GF225J
Resistor, Carbon, ¼ W, 5%, 2.2 Meg
Allen-Bradley
4 1 R4 RC20GF203J Resistor, Carbon, ¼ W, 5%, 20 k Allen-Bradley
5
1
R5
RC20GF183J
Resistor, Carbon, ¼ W, 5%, 18 k
Allen-Bradley
6 1 R6 RC07GF104J Resistor, Carbon, ½ W, 5%, 100 k Allen-Bradley
7
1
C1
DPMS-6D5
Capacitor, 5000 pFd, 600 Vdc
CDE
8
1
Q1
2N4392
Transistor, N-CH JFET
National
9 1 Q2 2N6725 Transistor, NPN Darlington National
10
1
Circuit Board
CCI
11 2
350-1300-11-07- Terminal Cambion
X90-1004 or X90-1004X Probe
Vue de la page 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 20

Commentaires sur ces manuels

Pas de commentaire